The argon station robot of No. 3 converter is a six-axis robot, the hardware part is composed of robot body, robot control cabinet, PLC (programmable logic controller), bunker system, video, system detection components, etc.
MEAI's new integrated multi-solution intelligent optimization batching system for iron preconditioning: a powerful tool for reducing iron preconditioning costs
Breaking through the "black box" of blast furnace: MEAI full 3D visualization on-line auxiliary analysis system of blast furnace smelting process and its practical application